Energizing Education Programme I

SNlatitudelongitudestateevacuationcapacitydeveloperprojecttitleinstallcapacitygrantstatuslevelcompletion
17.49684.5172Osun8030Sterling & Wilson Nig Ltd.Captive 8.03MW Gas Based Power Plant at Obafemi Awolowo University, Ile-Ife, Osun State84008450350746.4865Gas Engine Turbines and accessories delivered to the project site. Which includes Fresh Air Fans; Top container; Low Tension Piping; Inlet Air System; Air Conditioner; Exhaust Silencer, etc.
26.51583.3898Lagos 8030Sterling & Wilson Nig Ltd.Captive 8.03MW Gas Based Power Plant at University of Lagos84006850052048.1141Site sand filling and fencing have been completed. 8Km of Streetlight successfully installed. - First batch of the Work/ Training Center materials have been delivered to site
36.24597.1199Anambra 2496METKA West Africa Ltd. Captive 2.0MW Solar Hybrid Power Plant at Nnamdi Azikiwe University Awka43803584934274.97982..00MW PV Panels successfully installed, All major equipment have been installed including, PV panels, Transformers, Inverters, Batteries, Back DG sets, etc. 9.48km of streetlights have been installed. Workshop/ Training Center is 98% completed.
413.12465.1994Sokoto2000METKA West Africa Ltd. Captive 2.0MW Solar Hybrid Power Plant at Usman Danfodio University Sokoto43903667467604928.65km length of streetlights have been installed. 2..00MW PV Panels successfully installed All major equipment have been installed including, PV panels, Transformers, Inverters, Batteries, Back DG sets, etc.
56.13188.1413Ebonyi1155Sterling & Wilson Nig Ltd.Captive 1.0MW Solar Hybrid Power Plant at Alex Ekwueme University Ndufu-Alike Ikwo28002177698591.32100The Project was successfully commissioned on 2nd August 2019 with +9,500 staff and students now receiving adequate and reliable power. The project is in the process of being handed over to the university management, having completed over 1 year of O&M services and successfully trained the university staff to operate and maintain the power plant, WTC and streetlights.
65.56935.765Delta 624METKA West Africa Ltd. Captive 0.5MW Solar Hybrid Power Plant at University of Petroleum Resources Effurun13501621596356.04100All components of the project have been completed, including the pre commissioning tests on the distribution network. It is ready to be officially commissioned and to commence the O&M phase of the project.
710.27849.7969Bauchi 554Sterling & Wilson Nig Ltd.Captive 0.5MW Solar Hybrid Power Plant at Abubakar Tafawa Balewa University, Bauchi11201464381750.32100The Project was technically commissioned on 2nd February 2020 and the university has been receiving adequate and reliable power since then. The project is set for official commissioning and handover having completed the O&M phase and trained the university staff, in January 2021
811.97088.4347Kano3503METKA West Africa Ltd. Captive 3.0MW Solar Hybrid Power Plant at Bayero University, Kano State 71005095810001.63100The Project was successfully commissioned on 3rd September 2019 with +58,000 staff and students receiving adequate and reliable power. After completion of over 1 year of operations and maintenance of the power plant and training of the university staff to operate and maintain same, provided by the EPC/O&M Contractor, the EEP project was handed over to the university management on the 3rd December 2020 with all relevant project documentation .
97.73228.5391Benue4006Sterling & Wilson Nig Ltd.Captive 3.5MW Solar Hybrid Power Plant at University of Agriculture Makurdi82506052856508.321003.50MW PV Panels (8.25 total installed capacity) successfully installed. This project commenced O&M in July 2020, though was officially commissioned on the 4th December 2020